Citadel Heights · Port Coquitlam

Port Coquitlam Exterior Repaint

Full exterior repaint of a large 2-storey home in Citadel Heights — mixed hardie board and stucco siding, each surface prepped and primed differently for lasting results.

← Back to Projects

Before & After

Before Citadel Heights home exterior before repainting — faded stucco and hardie board
After Citadel Heights home exterior after repainting — fresh two-coat SW Duration finish

Project Specs

CityPort Coquitlam, BC
NeighbourhoodCitadel Heights
Service TypeExterior Painting
Duration5 days
Materials UsedSherwin-Williams Duration Exterior, Loxon XL Masonry & Stucco Primer for stucco sections, Bonding primer for hardie board, back-rolled finish

Scope of Work

Homes in Citadel Heights often feature the mixed siding combination common to late-1990s and early-2000s construction in the Tri-Cities — hardie board (fibre cement) on the lower level, stucco on the upper, with wood trim throughout. Each of these substrates has different requirements for proper prep and priming, and getting them wrong is the most common cause of premature paint failure on mixed-siding homes.

This Citadel Heights home's paint was faded and chalking on both substrates, with some efflorescence (salt deposits) on the stucco upper level. The scope included:

The key technical challenge on this project was ensuring the two different primers didn't create visible sheen or texture differences when the topcoat was applied over both substrates on the same elevation. Back-rolling both sections in the same application window, with consistent pressure and technique, is what produces a seamless result.

Our Process

1

Assessment & Substrate Mapping

Detailed walk-around to map all substrate types and identify any areas of cracking, delamination, or moisture damage in the stucco. Any cracks wider than 1/8" in the stucco noted for caulking. Hardie board joints inspected for failed caulk.

2

Pressure Wash & Dry Time

Full exterior washed working top to bottom. Stucco washed at 1,800 PSI; hardie board at 1,200 PSI. 48-hour dry time observed — stucco is highly porous and retains water longer than wood-based substrates.

3

Efflorescence Treatment & Caulking

Stucco efflorescence treated with masonry cleaner and rinsed. All hardie board butt joints re-caulked. All window and door frames on both substrates caulked. Stucco cracks filled with elastomeric caulk — flexible enough to accommodate the slight movement stucco experiences seasonally.

4

Substrate-Specific Priming

Loxon XL applied by roller to all stucco sections — its high build fills the texture uniformly and blocks alkalis that cause premature yellowing. Bonding primer applied by roller to all hardie board sections. Both primers allowed full cure time before topcoat.

5

Two-Coat Duration Application

SW Duration applied in two full coats across all surfaces. Working elevation by elevation, cutting in at trim lines and substrate changes first, then back-rolling the field. Trim, fascia, and window casings painted last for clean lines. Final walk-through with homeowners before sign-off.

★★★★★

"Absolutely amazing work! The attention to detail and professionalism really stood out, and the final result completely exceeded expectations."

— Dominic Brayton, Google Review

Our Work

See the Results

Live photos from our Google Business page — updated automatically as we add more projects.

Before — Exterior Repaint After — Exterior Repaint
BEFORE  →  AFTER
Exterior Repaint
Before — Deck Refinishing After — Deck Refinishing
BEFORE  →  AFTER
Deck Refinishing
View full gallery →
Project photo

Exterior Painting in Port Coquitlam?

We work across Citadel Heights, Mary Hill, Lincoln Park, and all of Port Coquitlam. Free quotes.

📞 Call (604) 417-6483